WSSC Water Main Replacement Project

Project Information Summary:

  • New water mains in portions of Lastner Lane and Ridge Road will be installed offset to the existing water mains, within the paved roadways.
  • New water transmission main serving the standpipe (water tank) will be relocated from existing backyards to the existing public dedication of Ridge Road.
  • Approximately 1,500 feet of new water distribution / transmission mains will be installed.

Please see documents listed on left side menu of this page for more information.

Project Contacts


ØKeith Tyson WSSC Engineering & Environmental Services, Division Manager

  Phone: 301-206-8801

  Email:

ØJason Flory – WSSC Pipeline Construction Division, Section Manager

  Phone: 301-206-4308

  Email: Jason.

ØDavid Wilkins – Customer Advocate

  Phone: 301-206-4371

  Email: